Prefabricated building assembled in the site 

In the foundation of these buildings firstly metal sheets are bent with cold rolling method and the joints are punched on them and the required pieces for netting them is welded with CO2. According to the plan, these profiles are connected to each other with bolts and nuts and form a metal network as the foundation of the building. The shape, size and thickness of iron profiles and how to network are designed and analyzed with specialized Abacus and Solidwork software.

Prefab building features assembled on site

  • Skeleton: Pillars, floor chassis, roof coil made of steel sheets in form of bent profiles
  • Paint: Sandblast and then oven paints
  • Ceiling: Shadowline polyurethane sandwich panel with two pre-painted galvanized sheets or aluzinc
  • Walls: 40 mm thick polyurethane wall sandwich panel with two pre-painted galvanized sheets or aluzinc (based on buyer's order)
  • Floor: grid with profile, trapezoidal bent sheet, compressed wood layer and then ceramic or parquet (based on buyer's order)
  • Door: Door sandwich panel with first-class locks and handles
  • Window: Aluminium with insulated glasses
  • Electrical and lighting system: Wiring according to the buyer's request, built-in or surface, using cables, fuses and standard switches